Track records - Heavy Lifting


[Back to overview]

Customer / Project Year Product
KOS / Statoil TPRS 1994 Lifting assembly 4 parts, MBL 252Te
ABB Transformers 1994 Lifting of Transformers,MBL 400Te
HMV; Sleipner Vest SLB 1995 Installation slings MBL 210Te
Stolt Comex Seaway 1995 Installation slings MBL 280Te
KOS 1995 Lifting Assemblies 3 & 4 parts
Shell UK / Brent C 1995 Oshore installation, MBL 350Te
KOS 1996 Lifting Assy. With spreaderbar
Rockwater 1996 Installation slings MBL 500Te
Coflexip Stena Offshore 1996 Installation slings
Stolt Comex S. /Harald 1996 Riser installation
Kværner Energy / turbines 1996 Lifting slings MBL 500Te
Stolt / Seaway Condor 1996 Installation slings MBL 324 and 280Te
Water Weight 1996 Lifting sling MBL 600Te
Wood and Clark 1996 MBL 800, 400Te
ABB Kraft / Turbines 1997 Hydroelectric Power Installation, MBL 400T
Stolt Comex Seaway 1997 Subsea installation slings, MBL 324Te
Stolt Comex S. / Ekofisk 1997 Installation Wye structure, MBL 375Te
KOS 1997 Installation Manifolds, MBL 390, 280, 210Te
Stolt / Rockwater 1997 Spool inst. Visund Tie-in, Norfra, N.Valhall
Selmer 1997 Concrete elements, MBL 450Te
Ministry of Defence 1997 Lifting neuclear submarine, MBL 600Te
KOS 1998 Installation of Manifolds, Hubs, MBL 390Te
Rockwater 1998 Subsea installation, MBL 270Te
Stolt / Maersk 1998 Installation slings MBL 270Te
ABB Nat. Transformers 1998 Transformer lifting, MBL 400, 280Te
Water Weight 1998 Lifting sling MBL 930Te
Rockwater 1999 Installation sling, MBL 650Te
NSB / New trains 1999 Train lifting, MBL 160Te
Rockwater / Åsgard 1999 Pull-in sling, MBL 1000Te, WLL 253Te
ABB Kraft 1999 Lifting Turbines, MBL 385Te
Stolt, Rockwater / Spools 1999 Installation slings
KOS / Terra Nova 1999 Inst. Manifolds, Hubbs, MBL 390, 210Te
Stolt Comex Seaway 1999 Installation slings MBL 525, 475Te
KOS / Manifolds, Hubbs 2000 Installation, MBL 388, 276, 155Te
Selmer / Concrete bridge 2000 Uglen, MBL 450Te
Stolt C.S / Pig recovery 2000 MBL 475, 270, 250Te
SCS, Rockwater / Spool 2000 Installation slings
KOS / Girassol 2000 Inst. Manifolds, Hubbs, MBL 390, 210Te
Coflexip / Kyle Tie Inn 2001 MBL 168Te
KOS 2001 Inst. Manifolds, Hubbs, MBL 560, 390, 210Te
Sonsub / Blue Water 2001 Pipeline recovery sling MBL 2045Te
Stolt Offshore / PRS 2001 Subsea inst. MBL 560Te
Coforni Italy 2001 Heavy lift, MBL 420Te
IMES UK / Neuclear 2002 Lifting slings MBL 750Te
KOS 2002 Inst. Manifolds, Hubbs, MBL 560, 390, 210Te
Stolt Offshore / PRS 2002 Subsea inst. MBL 560Te
General Energy 2002 Heavy lift onshore, MBL 700Te
Stolt Offshore / Girasoll 2002 Installation slings, MBL 204Te
Subsea 7 2003 Spool installation
Subsea 7 2003 Subsea installation, MBL 254Te
[Back to overview]


For further inquiries, please contact us by e-mail: post@selantic.com, or by phone: +47 55 92 73 00.


 | HOME PAGE |  CONTACT US |  ORGANIZATION |  SELANTIC SUBSEA AS |  SELANTIC FIBRE AS | ARTICLES  |   
©Selantic AS  webmaster@selantic.com