| Project | Customer | Delivery | Design Life | Contract / Product |
|---|---|---|---|---|
| Eid Parry Project, India | NKT | 09-95 | 10 years | Design and installation engineering of a Suction Plem Foundation |
| Fergus | Rockwater Ltd | 07-96 | 20 years | EPCI of 1x Suction Riser Base, 52t |
| Schiehallion | Coflexip Ltd | 05-97 | 25 years | Design, Engineering and manufacturing drawings of two riser base options: Suction-in and Impact Pile. |
| Åsgard A | Stolt Offshore | 08-98 | 20 years | EPC of 3xUmbilical Anchors 30t w/tethers |
| Troll C | Stolt Offshore | 08-98 | 30 years | PC of 3xSuction Anchors 54t |
| Troll C | Stolt Offshore | 08-99 | 30 years | PC of 6xSuction Anchors 54t |
| Åsgard B | Stolt Offshore | 05-99 | 20 years | EPC of 3xUmbilical Anchors 30t w/tethers |
| Åsgard B | BRES/RW | 07-99 | N/A | EPC of Pull-in Anchoring System for A02 Bundle |
| Snorre B | Coflexip Norge | 02-00 | 25 years | Design, Engineering and manufacturing drawings of 15x Riser Anchors, 30-80t |
| Heidrun | Halliburton | 02-00 | 20 years | EPC of 2x Hold Back Anchors w/tethers |
| Mikkel | Halliburton | 05-02 | 20 years | EPC of 1x Umbilical Anchor w/tether |